One of the world's largest wind turbines
Aerial photo Schneebergerhof energy park
Installation of the Enercon E-126
Solar carport at the Schneebergerhof energy park

juwi's succes story started in 1996 at a location with excellent wind conditions. juwi CEO Matthias Willenbacher and other enthusiasts realized a 500 kW Enercon E-40 turbine. In the course of time four more followed, in July 2003 a two MW Vestas V80. All turbines had an annual yield of 6.4 MW – more than enough to cover the needs of 4,000 households. In 2003 juwi has participated in one of the first repowering projects- replacing two first-generation turbines with modern E-66.  In 2010 a E-66 is going to be replaced with a  six MW turbine- an E-126- increasing the annual total yield to 13.4 MW.

 